Innovative Engineering & Design
ultracor.jpg

Ultra-Cor Arch

Structural Health Monitoring of Ultra-Cor Arch

Date Completed March 2013
Location Trans-Canada Highway near Corner Brook, NL
Client Atlantic Industries Limited (AIL)
Key Elements
  • Design and installation of customized SHM system
  • Development of battery protection system to allow reliable operation in harsh winter conditions

Design, installation, and operation of a customized Structural Health Monitoring system for an Ultra-Cor arch culvert.

This corrugated steel arch culvert is the first application of the “Ultra-Cor” profile developed by Atlantic Industries Limited (AIL). With its deep corrugations, the Ultra-Cor profile can span up to 30 metres. This arch was constructed as an underpass for local traffic after the twinning of the Trans-Canada Highway near Corner Brook, NL in 2011.

In order to assess the effectiveness of the innovative Ultra-Cor profile, SHM Canada was selected to design, install, and operate an instrumented monitoring system on the culvert. This system, which comprised strain gauges and temperature sensors connected to a cellular modem, was monitored continuously. Data was retrieved by SHM staff on a daily basis, checked for consistency, and forwarded to the client.

Our team supports Maritime innovators in testing of new materials and responds to the demands of the local climate.

Due to the lack of electrical power lines, the monitoring system was powered by a lead-acid battery charged by a solar panel. To prevent the acid in the battery from freezing during harsh Newfoundland winter, a unique battery protection system was developed and successfully implemented. As a result of the robust system design, attention to detail, and continual follow-up by SHM Canada engineers, data was collected with no losses during the 18-month period between installation and decommissioning.

projects_ultracor footer.jpg

Evaluate your cutting-edge design with our cutting-edge monitoring systems.